data centers

References

Data Centers in America: Digital infrastructure, energy reality, and the rise of closed loop systems, Greg Barnett, Oil and Gas 360 (2026).

Summary

Google

Uses tensor processing units, rather than GPUs. TPUs have slightly lower energy usage.

Since 2015, google has been making custom TPUs for things like powering Google Search

Uses

Cloud Computing

Resource Usage

Relatively little. CPUs are mainly used. Single racks use about 10-15 kW

Because of the lower power usage, they can often get away with air cooling. Alternatively, there's mild evaporation-assisted cooling.

AI Training

Processing pentabytes of data

Resource Usage

Very high

Uses hundreds of thousands of GPUs, which can pull up to 1.2 kW per chip 150-230 kW per rack

Air cooling is ruled out by the high heat, so you need direct-to-chip liquid cooling

AI Inference

Running a trained model to answer prompts

Resource Usage

Moderate per request, but massive at scale

10 to 50 basic queries can evaporate 500 mL of water

Water usage is 9L / kWh

Images take 5-30 times more energy (about as much as charging a smartphone from 0 to 100%). And 20-100 times more water (about 500 mL)

5 sec of video generation can take a further 30-150 times more energy (running a dishwasher for a cycle)

Usage Limits

The free tier of something ChatGPT, Claude, or Gemini puts you around 10-80 Wh / day (about as much as a fridge uses running for 1 hour)

High-Performance Computing

Weather forecasting, scientific research, cryptography

Resource Usage

High bursts of energy

High water usage

Energy

24/7 baseload demand Long-duration loads

Water

Traditional evaporative cooling systems cost millions of gallons of water / year

Lithium Bromide Absorption Cooling

Use water as refrigerant but lithium bromide as the absorbent

Location

Data centers are meant to couple into business or consumer-use infrastructure. This makes them bunch together, leading to heavy loads on the power grids in those locations.

Northern Virginia has the world's largest concentration of data centers

Financials

Large, creditworthy Willing to contract for firm capacity Tolerance for on-site or behind-the-meter solutions